Welcome Guest [Log In] [Register]
We hope you enjoy your visit.


You're currently viewing our forum as a guest. This means you are limited to certain areas of the board and there are some features you can't use. If you join our community, you'll be able to access member-only sections, and use many member-only features such as customizing your profile, sending personal messages, and voting in polls. Registration is simple, fast, and completely free.

Remember to visit our welcome thread here: Member Welcome Thread

Join our community!

*Flashing News*Email trigger on Alphadslr forum is now working.

To setup the email trigger for your account:
Just go to preference, select "Email & Subscription Settings" and Topic/Forum subscription alert type as "Alerts by email"..

For thread tracking, you need to manually enable it for each thread. Once you're viewing a thread, scroll down to the bottom of the page. Locate the option "Track Topic" which appears to the left of the Board Time.

From the page that loads you can select the notification type you want.




Username:   Password:
Add Reply
Copper Huang Expressway Standard Method
Topic Started: Sep 6 2016, 01:18 PM (12 Views)
qzz10011
Alpha Jedi Member

Project department when planning to build temporary office space per capita area of ??not less than 6 square meters per capita living space area of ??not less than 5 square meters of construction area per capita living space area of ??not less than five square meters, all of the office, living with rooms are color-coated steel housing, so that employees live, living conditions greatly improved: laundry, bathroom, room, cafeteria, basketball courts and other facilities, staff housing for an air conditioner, wardrobe, television have become standard accessories, change construction sites in the past "dirty and messy," the phenomenon.

Promoting job Process Standardization Project Department vigorously promote "the first piece approval system" and the "standard construction method." Before each sub-project construction, the construction that is the first test section of the first article, in accordance with the plan and construction organization for examination to the approval, construction to continue construction concluded (success) or re-organization of construction (failure).

"Standard Method" is in accordance with sub-item part project, such as a roadbed excavation, embankment fill, channels, culverts, etc., each sub-item, part project personnel, machinery and equipment, materials, construction plan, process, management procedures are Similarly, each Section, division of Engineering are also the same process, control standards. Construction, project department emphasis on technological innovation and technological innovation, the positive application of new technologies and equipment, not only improve the efficiency of construction and production, and effectively promoted the standardization of construction work.

<p>Related Sites:<br>
concrete slurry disposal<br>
milling machine products<br>
seal cracks<br>
self-propelled crack sealer
</p>
Pavement Repair Machine-pothole repair machine