| We hope you enjoy your visit. You're currently viewing our forum as a guest. This means you are limited to certain areas of the board and there are some features you can't use. If you join our community, you'll be able to access member-only sections, and use many member-only features such as customizing your profile, sending personal messages, and voting in polls. Registration is simple, fast, and completely free. Remember to visit our welcome thread here: Member Welcome Thread Join our community! *Flashing News*Email trigger on Alphadslr forum is now working. To setup the email trigger for your account: Just go to preference, select "Email & Subscription Settings" and Topic/Forum subscription alert type as "Alerts by email".. For thread tracking, you need to manually enable it for each thread. Once you're viewing a thread, scroll down to the bottom of the page. Locate the option "Track Topic" which appears to the left of the Board Time. From the page that loads you can select the notification type you want. |
| Second, the paver transporters and transport stage of the operating procedures | |
|---|---|
| Tweet Topic Started: Nov 19 2016, 10:12 AM (9 Views) | |
| qzz10011 | Nov 19 2016, 10:12 AM Post #1 |
|
Alpha Jedi Member
|
<p>1) crawler paver shall not travel long distances, the driving distance is generally not more than 1 km, otherwise it will damage the walking gear. More than 1 km from the pallet truck transport. Special need for long-distance travel, check the walking gear oil must meet the requirements,<a href="http://roadroutercrack.com/blog-new/2164.html">Safe Operation Of The Cutting Machine Covers</a> the hopper should be added with weight, so that the front and rear wheel evenly to reduce load on the back-wheel, slow down the wear and damage. At any time to check whether the deceleration of walking overheating, if necessary, stop cooling to normal operating temperature.</p> <P>2) When running, the screed shall be restored to its basic width and raised with a hook.</P> <P>3) In normal circumstances, prohibit traction paver. In special cases, the paver must be pulled when it must be towed.</P> <p>In addition to braking, the use of rigid towbar,<a href="http://roadroutercrack.com/blog-new/3164.html">Good quality potting machine manufacturer</a> shall not use wire rope.</p> <P>4) Prohibit the use of paver traction other machinery.</P> <p>5) with the pallet truck transport paver, the requirements:</p> <p>‡@ Check whether the ladder on the car ladder to meet the requirements of the pavers on the ladder, it should not make the screed after the screed and dragons or scrape the ladder to the ladder to prevent the rear ironing device to enhance the cylinder piston and arm deformation.</p> <p>(2) When hoisting paver with hoisting crane, choose the crane with enough hoisting capacity, choose the steel rope with enough strength and no damage, select the hoisting point specified by the paver design, hoist and scraper cooperate closely ,<a href="http://roadroutercrack.com/blog-new/412.html">High grade micro surfacing paver manufacturers</a> The paver safely hoisted on the train.</p> <p>‡B paver flattening device placed in the middle of the carriage trailer board and padded with wood to prevent slip between steel pieces. Around the carriage with iron pile positioning file live, tied tightly with wire rope tensioner to prevent the paver in the transport around the move.</p> <p>‡C paver installed on the trailer, with a rain cloth (or plastic sheet) wrapped around the electric console and tied tightly. Tilt the cockpit and tie it tightly. Measured the total height of loading, a written notice to the pallet truck driver, in order to safely pass the corresponding height of the bridge and culvert.</p> <p>‡D longitudinal slope instrument, horizontal slope instrument and level device, hand control, the total electrical control box and helix and other application-specific box to keep good, on the pallet truck driving the building transport or professional transport and handover procedures. After the disintegration of other paver special parts, should be registered books, installed in the difficult position or lost by special car shipment. Arrived at the destination after the inventory, for handover procedures.</p> <p>‡E Paver fixed position in the pallet truck, pull out the start key, turn off the power switch; if there is no gate, the battery should be a large line off to prevent leakage of fire during transport, causing a fire.</p> |
| Pavement Repair Machine-pothole repair machine | |
![]() |
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · Photo Critique and Post Process Request · Next Topic » |






8:15 AM Jul 11